Construction · Australia
Australia Construction Work Done QoQ
The Australia Construction Work Done QoQ measures building activity in Australia: housing, commercial buildings and infrastructure.
- חשיבות
- Medium
- פורסם
- Quarterly
- הפרסום הבא
- מטבע
- AUD · Australian dollar
- בנק מרכזי
- The Reserve Bank of Australia
הנתונים האחרונים
הפרסום האחרון, עבור Q2, יצא ב-2026-08-26 ועמד על -2.1%. זה מתחת לקונצנזוס של 0.5%. זה ירידה מ-4.3% בפעם הקודמת (מעודכן).
A weaker figure than expected points to slowing activity: the Australian dollar tends to soften and markets price in lower rates.
ב-7 הפרסומים האחרונים הערך נע בין -2.1% ל-3.4%, בממוצע 0.6%.
| פורסם | עבור | בפועל | קונצנזוס | קודם |
|---|---|---|---|---|
| 26 Aug 2026 | Q2 | -2.1% | 0.5% | 4.3% ® |
| 27 May 2026 | Q1 | 3.4% | 0.8% | 0.2% ® |
| 25 Feb 2026 | Q4 | -0.1% | 0.9% | 0.1% ® |
| 26 Nov 2025 | Q3 | -0.7% | 0.4% | 2.9% ® |
| 27 Aug 2025 | Q2 | 3.0% | 0.7% | -0.3% ® |
| 28 May 2025 | Q1 | 0% | 0.5% | 0.9% ® |
| 26 Feb 2025 | Q4 | 0.5% | 1% | 2.0% ® |
למה זה חשוב
Construction is sensitive to interest rates and an early casualty of tighter credit; it also feeds jobs and materials demand.
איך זה מחושב
Output or spending on construction projects, reported by builders and adjusted for prices and seasons.
מה המשמעות של שינויים
- Falling construction after rate hikes shows policy working.
- Public infrastructure can offset weak private building.
גבוה מהצפוי: A stronger figure than expected points to a healthier economy: it usually supports the Australian dollar and local stocks, and can push bond yields up.
נמוך מהצפוי: A weaker figure than expected points to slowing activity: the Australian dollar tends to soften and markets price in lower rates.
היסטוריה קצרה
Construction statistics became standard in the post-war rebuilding era; housing booms and busts, such as 2006–2009, made them closely watched.
שאלות
What is the Australia Construction Work Done QoQ?
The Australia Construction Work Done QoQ measures building activity in Australia: housing, commercial buildings and infrastructure.
What was the latest Australia Construction Work Done QoQ?
-2.1% for Q2, published on 26 August 2026 (consensus 0.5%, previous 4.3%).
When is the next Australia Construction Work Done QoQ?
On Wednesday 25 November 2026 at 00:30 UTC.
תוכן לימודי בלבד, לא ייעוץ השקעות. הנתונים הם התוצאות שפורסמו כפי שנרשמו ביומן שלנו; תגובות השוק המתוארות אופייניות, לא מובטחות.