Construction · Australia

Australia Construction Work Done QoQ

The Australia Construction Work Done QoQ measures building activity in Australia: housing, commercial buildings and infrastructure.

Wichtigkeit
Medium
Veröffentlicht
Quarterly
Nächste Veröffentlichung
Währung
AUD · Australian dollar
Zentralbank
The Reserve Bank of Australia
Bewegt
AUDCAD · AUDCHF · AUDJPY · AUDNZD · AUDUSD · EURAUD · GBPAUD

Neueste Zahlen

Die letzte Veröffentlichung, für Q2, erschien am 2026-08-26 und lag bei -2.1%. Das liegt unter dem Konsens von 0.5%. Das ist weniger als 4.3% beim letzten Mal (revidiert).

A weaker figure than expected points to slowing activity: the Australian dollar tends to soften and markets price in lower rates.

In den letzten 7 Veröffentlichungen lag der Wert zwischen -2.1% und 3.4%, im Schnitt 0.6%.

Feb 2025: 0.5%May 2025: 0%Aug 2025: 3.0%Nov 2025: -0.7%Feb 2026: -0.1%May 2026: 3.4%Aug 2026: -2.1% Feb 2025Aug 2026
Tatsächliche Ergebnisse; der kurze Strich auf einem Balken markiert den Konsens.
VeröffentlichtFürIstKonsensVorher
26 Aug 2026Q2-2.1%0.5%4.3% ®
27 May 2026Q13.4%0.8%0.2% ®
25 Feb 2026Q4-0.1%0.9%0.1% ®
26 Nov 2025Q3-0.7%0.4%2.9% ®
27 Aug 2025Q23.0%0.7%-0.3% ®
28 May 2025Q10%0.5%0.9% ®
26 Feb 2025Q40.5%1%2.0% ®

Im Wirtschaftskalender ansehen →

Warum es wichtig ist

Construction is sensitive to interest rates and an early casualty of tighter credit; it also feeds jobs and materials demand.

So wird gerechnet

Output or spending on construction projects, reported by builders and adjusted for prices and seasons.

Was Veränderungen bedeuten

  • Falling construction after rate hikes shows policy working.
  • Public infrastructure can offset weak private building.

Höher als erwartet: A stronger figure than expected points to a healthier economy: it usually supports the Australian dollar and local stocks, and can push bond yields up.

Niedriger als erwartet: A weaker figure than expected points to slowing activity: the Australian dollar tends to soften and markets price in lower rates.

Eine kurze Geschichte

Construction statistics became standard in the post-war rebuilding era; housing booms and busts, such as 2006–2009, made them closely watched.

Fragen

What is the Australia Construction Work Done QoQ?

The Australia Construction Work Done QoQ measures building activity in Australia: housing, commercial buildings and infrastructure.

What was the latest Australia Construction Work Done QoQ?

-2.1% for Q2, published on 26 August 2026 (consensus 0.5%, previous 4.3%).

When is the next Australia Construction Work Done QoQ?

On Wednesday 25 November 2026 at 00:30 UTC.

Nur Bildungsinhalte, keine Anlageberatung. Die Zahlen sind die veröffentlichten Ergebnisse, wie sie unser Kalender erfasst hat; die beschriebenen Marktreaktionen sind typisch, nicht garantiert.