Construction · Australia

Australia Construction Work Done QoQ

The Australia Construction Work Done QoQ measures building activity in Australia: housing, commercial buildings and infrastructure.

Importancia
Medium
Publicado
Quarterly
Próxima publicación
Divisa
AUD · Australian dollar
Banco central
The Reserve Bank of Australia
Mueve
AUDCAD · AUDCHF · AUDJPY · AUDNZD · AUDUSD · EURAUD · GBPAUD

Últimas cifras

El último dato, de Q2, se publicó el 2026-08-26 y fue -2.1%. Está por debajo del consenso de 0.5%. Es menos que 4.3% la vez anterior (revisado).

A weaker figure than expected points to slowing activity: the Australian dollar tends to soften and markets price in lower rates.

En las últimas 7 publicaciones osciló entre -2.1% y 3.4%, con una media de 0.6%.

Feb 2025: 0.5%May 2025: 0%Aug 2025: 3.0%Nov 2025: -0.7%Feb 2026: -0.1%May 2026: 3.4%Aug 2026: -2.1% Feb 2025Aug 2026
Resultados reales; la línea corta sobre una barra marca el consenso.
PublicadoParaRealConsensoAnterior
26 Aug 2026Q2-2.1%0.5%4.3% ®
27 May 2026Q13.4%0.8%0.2% ®
25 Feb 2026Q4-0.1%0.9%0.1% ®
26 Nov 2025Q3-0.7%0.4%2.9% ®
27 Aug 2025Q23.0%0.7%-0.3% ®
28 May 2025Q10%0.5%0.9% ®
26 Feb 2025Q40.5%1%2.0% ®

Verlo en el calendario económico →

Por qué importa

Construction is sensitive to interest rates and an early casualty of tighter credit; it also feeds jobs and materials demand.

Cómo se calcula

Output or spending on construction projects, reported by builders and adjusted for prices and seasons.

Qué significan los cambios

  • Falling construction after rate hikes shows policy working.
  • Public infrastructure can offset weak private building.

Mayor de lo esperado: A stronger figure than expected points to a healthier economy: it usually supports the Australian dollar and local stocks, and can push bond yields up.

Menor de lo esperado: A weaker figure than expected points to slowing activity: the Australian dollar tends to soften and markets price in lower rates.

Una breve historia

Construction statistics became standard in the post-war rebuilding era; housing booms and busts, such as 2006–2009, made them closely watched.

Preguntas

What is the Australia Construction Work Done QoQ?

The Australia Construction Work Done QoQ measures building activity in Australia: housing, commercial buildings and infrastructure.

What was the latest Australia Construction Work Done QoQ?

-2.1% for Q2, published on 26 August 2026 (consensus 0.5%, previous 4.3%).

When is the next Australia Construction Work Done QoQ?

On Wednesday 25 November 2026 at 00:30 UTC.

Solo contenido educativo, no asesoramiento de inversión. Las cifras son los resultados publicados según los registra nuestro calendario; las reacciones del mercado descritas son típicas, no garantizadas.