Construction · Australia
Australia Construction Work Done QoQ
The Australia Construction Work Done QoQ measures building activity in Australia: housing, commercial buildings and infrastructure.
- الأهمية
- Medium
- صدر
- Quarterly
- الإصدار التالي
- العملة
- AUD · Australian dollar
- البنك المركزي
- The Reserve Bank of Australia
أحدث الأرقام
صدر آخر إصدار، عن Q2، في 2026-08-26 وجاء عند -2.1%. هذا أدنى من الإجماع البالغ 0.5%. هذا أقل من 4.3% في المرة السابقة (معدّل).
A weaker figure than expected points to slowing activity: the Australian dollar tends to soften and markets price in lower rates.
خلال آخر 7 إصدارات تراوح بين -2.1% و3.4%، بمتوسط 0.6%.
| صدر | المدة | الفعلي | التوقعات | السابق |
|---|---|---|---|---|
| 26 Aug 2026 | Q2 | -2.1% | 0.5% | 4.3% ® |
| 27 May 2026 | Q1 | 3.4% | 0.8% | 0.2% ® |
| 25 Feb 2026 | Q4 | -0.1% | 0.9% | 0.1% ® |
| 26 Nov 2025 | Q3 | -0.7% | 0.4% | 2.9% ® |
| 27 Aug 2025 | Q2 | 3.0% | 0.7% | -0.3% ® |
| 28 May 2025 | Q1 | 0% | 0.5% | 0.9% ® |
| 26 Feb 2025 | Q4 | 0.5% | 1% | 2.0% ® |
لماذا يهم
Construction is sensitive to interest rates and an early casualty of tighter credit; it also feeds jobs and materials demand.
طريقة الحساب
Output or spending on construction projects, reported by builders and adjusted for prices and seasons.
ما تعنيه التغيرات
- Falling construction after rate hikes shows policy working.
- Public infrastructure can offset weak private building.
أعلى من المتوقع: A stronger figure than expected points to a healthier economy: it usually supports the Australian dollar and local stocks, and can push bond yields up.
أقل من المتوقع: A weaker figure than expected points to slowing activity: the Australian dollar tends to soften and markets price in lower rates.
لمحة تاريخية قصيرة
Construction statistics became standard in the post-war rebuilding era; housing booms and busts, such as 2006–2009, made them closely watched.
الأسئلة
What is the Australia Construction Work Done QoQ?
The Australia Construction Work Done QoQ measures building activity in Australia: housing, commercial buildings and infrastructure.
What was the latest Australia Construction Work Done QoQ?
-2.1% for Q2, published on 26 August 2026 (consensus 0.5%, previous 4.3%).
When is the next Australia Construction Work Done QoQ?
On Wednesday 25 November 2026 at 00:30 UTC.
محتوى تعليمي فقط، وليس نصيحة استثمارية. الأرقام هي النتائج المنشورة كما سجّلتها مفكرتنا؛ وردود فعل السوق الموصوفة نموذجية وليست مضمونة.