Construction · Australia
Australia Construction Work Done QoQ
The Australia Construction Work Done QoQ measures building activity in Australia: housing, commercial buildings and infrastructure.
- Важность
- Medium
- Опубликовано
- Quarterly
- Следующая публикация
- Валюта
- AUD · Australian dollar
- Центральный банк
- The Reserve Bank of Australia
Последние данные
Последняя публикация, за Q2, вышла 2026-08-26; значение: -2.1%. Это ниже консенсус-прогноза 0.5%. Это ниже, чем 4.3% в прошлый раз (пересмотрено).
A weaker figure than expected points to slowing activity: the Australian dollar tends to soften and markets price in lower rates.
За последние 7 публикаций значение колебалось от -2.1% до 3.4%, в среднем 0.6%.
| Опубликовано | Для | Факт | Консенсус | Предыдущее |
|---|---|---|---|---|
| 26 Aug 2026 | Q2 | -2.1% | 0.5% | 4.3% ® |
| 27 May 2026 | Q1 | 3.4% | 0.8% | 0.2% ® |
| 25 Feb 2026 | Q4 | -0.1% | 0.9% | 0.1% ® |
| 26 Nov 2025 | Q3 | -0.7% | 0.4% | 2.9% ® |
| 27 Aug 2025 | Q2 | 3.0% | 0.7% | -0.3% ® |
| 28 May 2025 | Q1 | 0% | 0.5% | 0.9% ® |
| 26 Feb 2025 | Q4 | 0.5% | 1% | 2.0% ® |
Почему это важно
Construction is sensitive to interest rates and an early casualty of tighter credit; it also feeds jobs and materials demand.
Как считается
Output or spending on construction projects, reported by builders and adjusted for prices and seasons.
Что означают изменения
- Falling construction after rate hikes shows policy working.
- Public infrastructure can offset weak private building.
Выше ожиданий: A stronger figure than expected points to a healthier economy: it usually supports the Australian dollar and local stocks, and can push bond yields up.
Ниже ожиданий: A weaker figure than expected points to slowing activity: the Australian dollar tends to soften and markets price in lower rates.
Краткая история
Construction statistics became standard in the post-war rebuilding era; housing booms and busts, such as 2006–2009, made them closely watched.
Вопросы
What is the Australia Construction Work Done QoQ?
The Australia Construction Work Done QoQ measures building activity in Australia: housing, commercial buildings and infrastructure.
What was the latest Australia Construction Work Done QoQ?
-2.1% for Q2, published on 26 August 2026 (consensus 0.5%, previous 4.3%).
When is the next Australia Construction Work Done QoQ?
On Wednesday 25 November 2026 at 00:30 UTC.
Только образовательный материал, не инвестиционная рекомендация. Цифры — опубликованные результаты в том виде, в каком их записал наш календарь; описанные реакции рынка типичны, но не гарантированы.